TM 5-2330-325-13&P
0054
INSTALLATION - Continued
NOTE
Lug nuts should be rechecked for proper tightness after the first 50 mi. (80.5 km) to
100 mi. (160.9 km) of operation after wheel reinstallation.
6.
Lower semitrailer and remove suitable lifting device and suitable support from equalizing beams.
END OF TASK
FOLLOW ON TASK
1.
2.
3.
4.
5.
6.
7.
END OF TASK
END OF WORK PACKAGE
0054-6
02/13/2013root(maintwp)wpno(M1022)