• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Unknown' by Unknown - Page 211 of 648
'Unknown' by Unknown - Page 213 of 648

Field Maintenance Manual For Semitrailer, Medium Heavy Equipment Transporter, 40 Ton, M870A3
Page Navigation
  167    168    169    170    171  172  173    174    175    176    177  
img
. .
TM 5-2330-325-13&P
0044
REMOVAL
1.
Remove two nuts (Figure 1, Item 3) and lockwashers (Figure 1, Item 2) holding blackout light
(Figure 1, Item 5) to semitrailer frame (Figure 1, Item 1). Discard lockwashers (Figure 1, Item 2).
2.
Partially pull blackout light (Figure 1, Item 5) away from semitrailer frame (Figure 1, Item 1).
3.
Remove tiedown straps from wiring harness. Discard tiedown straps.
4.
Disconnect connectors (Figure 1, Items 4 and 6) from main wiring harness.
5.
Remove blackout light (Figure 1, Item 5) from semitrailer.
END OF TASK
INSTALLATION
1.
Thread blackout light wires through semitrailer mounting holes and semitrailer electrical harness clip and
connect blackout light and harness connectors (Figure 1, Items 4 and 6) to main wiring harness.
2.
Install new tiedown straps to wiring harness.
3.
Install blackout light (Figure 1, Item 5) on semitrailer frame (Figure 1, Item 1) with two nuts (Figure 1, Item 3)
and new lockwashers (Figure 1, Item 2).
1
23
6
4
5
466-0046
Figure 1.
Blackout Light Replacement.
END OF TASK
FOLLOW ON TASK
1.
Connect power source and test electrical system for proper operation.
2.
Install taillight (WP 0045).
END OF TASK
END OF WORK PACKAGE
0044-2
02/13/2013root(maintwp)wpno(M1013)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.