• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HEAVY-DUTY WINCH COUNTERBALANCE VALVE REMOVAL/INSTALLATION - Continued
HEAVY-DUTY WINCH COUNTERBALANCE VALVE REMOVAL/INSTALLATION - Continued

Truck, Tractor, Light Equipment Transporter, 8X8 M983A2 Let Page Navigation
  466    467    468    469    470  471  472    473    474    475    476  
img
.
TB 9-2320-279-13&P-4
0071
2. Lightly lubricate preformed packing (24) with clean oil and install preformed packing (24) and fitting (10) on
counterbalance valve block (6).
3. Lightly lubricate preformed packing (23) with clean oil and install preformed packing (23) and fitting (8) on
counterbalance valve block (6).
4. Lightly lubricate packing retainer (22), preformed packing (21), packing retainer (20), preformed packing (19),
two packing retainers (18), and preformed packing (17) with clean oil and install packing retainer (22), preformed
packing (21), packing retainer (20), preformed packing (19), two packing retainers (18), and preformed packing
(17) on counterbalance valve (16).
5. Install counterbalance valve (16) on counterbalance valve block (6).
6. Lightly lubricate preformed packing (14) with clean oil and install preformed packing (14) and counterbalance
valve block (6) on winch motor (15) with four screws (13). Tighten screws to 53 lb-ft (72 Nm).
4
5
3
1
2
6 14
7
8
10
11
13
12
15
9
Figure 4.
7. Install hose (11) on fitting (12).
8. Install hose (9) on fitting (10).
9. Install hose (7) on fitting (8).
0071-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.