• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HEAVY-DUTY WINCH COUNTERBALANCE VALVE REMOVAL/INSTALLATION - Continued
HEAVY-DUTY WINCH CONTROL VALVE REMOVAL/INSTALLATION

Truck, Tractor, Light Equipment Transporter, 8X8 M983A2 Let Page Navigation
  467    468    469    470    471  472  473    474    475    476    477  
img
.
TB 9-2320-279-13&P-4
0071
10. Lightly lubricate preformed packing (5) with clean oil and install preformed packing (5) and fitting (4) on
counterbalance valve block (6) with two clamp halves (3), lockwashers (2), and screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1. Check hydraulic fluid level (refer to TM 9-2320-315-14&P).
2. Start engine (refer to TM 9-2320-279-10).
3. Check hydraulic system for leaks (refer to TM 9-2320-315-14&P).
4. Check operation of heavy-duty winch. (WP 0015)
5. Shut OFF engine (refer to TM 9-2320-279-10).
6. Remove wheel chocks (refer to TM 9-2320-279-10).
END OF WORK PACKAGE
0071-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.