• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HEAVY-DUTY WINCH COUNTERBALANCE VALVE REMOVAL/INSTALLATION - Continued
HEAVY-DUTY WINCH COUNTERBALANCE VALVE REMOVAL/INSTALLATION - Continued

Truck, Tractor, Light Equipment Transporter, 8X8 M983A2 Let Page Navigation
  465    466    467    468    469  470  471    472    473    474    475  
img
.
TB 9-2320-279-13&P-4
0071
12 25
6
21 22
17 18
8
23
16
10 24
16
19 20
Figure 2.
7. Remove preformed packing (17), two packing retainers (18), preformed packing (19), packing retainer (20),
preformed packing (21), and packing retainer (22) from counterbalance valve (16). Discard preformed packings
and packing retainers.
8. Remove fitting (8) and preformed packing (23) from counterbalance valve block (6). Discard preformed packing.
9. Remove fitting (10) and preformed packing (24) from counterbalance valve block (6). Discard preformed packing.
10. Remove fitting (12) and preformed packing (25) from counterbalance valve block (6). Discard preformed packing.
END OF TASK
INSTALLATION
NOTE
Install fittings as noted prior to removal.
1. Lightly lubricate preformed packing (25) with clean oil and install preformed packing (25) and fitting (12) on
counterbalance valve block (6).
12 25
6
21 22
17 18
8
23
16
10 24
16
19 20
Figure 3.
0071-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.