HYDRAULIC RETURN MANIFOLD REMOVAL/INSTALLATION - Continued
HEAVY-DUTY WINCH COUNTERBALANCE VALVE REMOVAL/INSTALLATION

Truck, Tractor, Light Equipment Transporter, 8X8 M983A2 Let Page Navigation
  461    462    463    464    465  466  467    468    469    470    471  
img
.
TB 9-2320-279-13&P-4
0070
1
5
3
4
2
6
7
Figure 8.
9. Lightly lubricate preformed packing (4) with clean oil and install preformed packing (4) and hose 2883 (3) on
fitting (5).
10. Install hose 2277 (1) on fitting (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1. Start engine (refer to TM 9-2320-279-10).
2. Check hydraulic system for leaks (refer to TM 9-2320-315-14&P).
3. Shut OFF engine (refer to TM 9-2320-279-10).
4. Check hydraulic fluid level (refer to TM 9-2320-315-14&P).
5. Remove wheel chocks (refer to TM 9-2320-279-10).
END OF WORK PACKAGE