Figure 48b. Installation of the Escape Hatch Brackets.
Figure 48B. Blackout Light installation.

Maintenance Manual For Crew Protection Kit For M977 Series Hemtt Page Navigation
  281    282    283    284    285  286  287    288    289    290    291  
img
. . . . . . .
II106700-5
Rev. B
Page 79
5.1.11 Re-Install the LH and RH Door-Mounted Outside Mirrors
a. Position the LH outside mirror frame and mirror on the outside of the LH door.
b. Apply Loctite 242 to four bolts (1/4 20 x 1.750 LG).
c. Attach the mirror frame to the door using the four prepared bolts
(1/4 20 x 1.750 LG), four flat washers (1/4 ID), and four locknuts (1/4 20).
d. Torque the locknuts to 9 ft-lb.
e. Repeat Steps "a" through "d" for the RH Door-Mounted Outside Mirror.
5.1.12 Re-Install the Cab Steps (with the Internal Clearance Light)
a. Apply Loctite 242 to four bolts (5/16 18 x 1.250 LG).
b. Position the hard metal cab step onto the bottom surface of the driver's-side Blast
Deflector using the four previously prepared bolts (5/16 18 x 1.500 LG),
eight washers (5/16 ID), and four locknuts (5/16 18). Torque the locknuts to
18 ft-lb.
c. Plug the wiring harness into the Clearance Light. Use the extra Pigtail Harness (P/N
111438-3) supplied in the Side Armor Panel Kit, P/N 103703-9, -10.
d.
Repeat Steps "a" through "c" for the passenger-side cab step.
5.1.13 Re-install the Blackout Light
a. Remove the Blackout Light from the old bracket and install it in the new bracket,
(P/N 111459-1), using the same hardware (see Figure 48B).
b. Extend the vehicle Blackout Light wiring connection using the Pigtail Harness,
(P/N 111438-3) supplied in the Front Armor Protection Kit, P/N 106705-3.
c. Re-connect the vehicle Blackout Light wire connection using the Pigtail Harness,
(P/N 111438-3)
5.1.14 Re-Install the Bridge Weight Sign
a. Re-install the Bridge Weight Sign over the holes provided on the passenger side of
the Upper Brush Guard Cover (P/N 111437-1) and secure it in place using two bolts
(1/4 20 x 1.250 LG), four flat washers (1/4 ID), and two locknuts (1/4 20) (See
Figure 49).
d. Torque the two locknuts to 9 ft-lb.