TM 5-2330-325-14&P
This task covers:
a. Removal
b. Cleaning
c. Inspection
d.
Installation
Initial Setup:
Equipment Conditions:
Materials/Parts:
Trailer parked on level ground, brakes engaged
and wheels chocked.
Tools/Test Equipment:
Tool kit, mechanics general,
a.
Removal.
(1) Disconnect release cable (3) from dump valve (1).
(2)
Remove dump valve (1) from front or rear air reservoir (2).