TM 5-2330-325-14&P
4-54.
FRONT RESERVOIR MAINTENANCE (Continued).
d.
Installation.
(1)
Install air reservoir (2) and two new gaskets (7) to trailer frame (8) using four bolts (1),
eight washers (6), and four new self-locking nuts (5).
(2)
Apply anti-seize tape to threads of elbow (3) and install elbow to air reservoir (2).
(3)
Connect air hose (4) and elbow (3).
(4)
Remove sealing tape from outlet coupling (9) to spring brake control valve and apply anti-
seize tape to threads of valve outlet coupling.
FOLLOW -ON TASKS:
None.