TM 5-2330-325-14&P
This task covers:
a. Removal
b. Inspection
c. Installation
Initial Setup:
Equipment Conditions:
Tools/Test Equipment:
Tool kit, mechanics general,
a.
Removal.
(1)
Remove full circle retainer rings (1) and flat washers (2) and withdraw both groved pins (3)
and bushing (4).
(2)
Remove two sleeved bushing retainer clips 7).
(3)
Swing back brake shoes (5) and remove shoes with return spring (8).
(4)
Remove both sleeved bushings (6).