• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Unknown' by Unknown - Page 354 of 648
'Unknown' by Unknown - Page 356 of 648

Field Maintenance Manual For Semitrailer, Medium Heavy Equipment Transporter, 40 Ton, M870A3
Page Navigation
  310    311    312    313    314  315  316    317    318    319    320  
img
.
TM 5-2330-325-13&P
0076
INSPECTION
Inspect fittings for damage and replace as needed.
END OF TASK
ASSEMBLY
Install all fittings onto hydraulic control valve.
END OF TASK
INSTALLATION
1.
Remove tape or cap from control valve (Figure 1, Item 1) pressure gage port.
2.
Apply antiseizing tape to threads of pressure gage (Figure 1, Item 2), thread gage onto control valve
(Figure 1, Item 1), and orient gage to vertical position.
3.
Install hydraulic control valve (Figure 1, Item 1) onto inside wall of gooseneck with three mounting bolts
(Figure 1, Item 5), washers (Figure 1, Item 6), and new self-locking nuts (Figure 1, Item 7). Torque nuts to
35 lb ft (47.45 Nm).
4.
Remove tape and/or cap from pressure gage hydraulic line (Figure 1, Item 3).
5.
Apply antiseizing tape to threads of connector, and connect and tighten pressure gage hydraulic line
(Figure 1, Item 3) to pressure gage (Figure 1, Item 2).
6.
Remove tape and/or caps from five hydraulic lines (Figure 1, Item 4) to be connected to inlet and outlet
ports of control valve (Figure 1, Item 1) and apply antiseizing tape to threads of connectors.
7.
Connect and tighten five hydraulic lines (Figure 1, Item 4) to appropriate ports on control valve
(Figure 1, Item 1) as directed by tags attached during removal procedure.
8.
Pressurize system and check for leaks leaks (WP 0066).
END OF TASK
END OF WORK PACKAGE
0076-3/blank
02/13/2013root(maintwp)wpno(M1044)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.