TM 5-2330-325-13&P
0075
INSTALLATION
1.
Position gravel guard (Figure 2, Item 2) on main mounting bracket (Figure 2, Item 6).
2.
Insert four screws (Figure 2, Item 7) through support bracket (Figure 2, Item 1), gravel guard
(Figure 2, Item 2), and main mounting bracket (Figure 2, Item 6).
3.
Secure support bracket (Figure 2, Item 1) and gravel guard (Figure 2, Item 2) to main mounting bracket
(Figure 2, Item 6) with four washers (Figure 2, Item 5) and new self-locking nuts (Figure 2, Item 4).
4.
Install gravel guard assembly and two pins (Figure 2, Item 3).
2
1
3
4
5
6
7
466-0074
Figure 2.
Gooseneck Gravel Guard Installation.
END OF TASK
END OF WORK PACKAGE