• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Unknown' by Unknown - Page 350 of 648
'Unknown' by Unknown - Page 352 of 648

Field Maintenance Manual For Semitrailer, Medium Heavy Equipment Transporter, 40 Ton, M870A3
Page Navigation
  306    307    308    309    310  311  312    313    314    315    316  
img
. . . . .
TM 5-2330-325-13&P
0075
FIELD MAINTENANCE
GOOSENECK GRAVEL GUARD REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
Materials/Parts (cont.)
Tool Kit, General Mechanic's
Qty: (4) WP 0129, Figure 32, Item 4
(WP 0144, Table 1, Item 16)
Equipment Condition
Materials/Parts
Semitrailer parked on level ground (WP 0005)
Nut, Self-Locking
REMOVAL
1.
Remove two pins (Figure 1, Item 3) and gravel guard assembly.
2.
Remove four self-locking nuts (Figure 1, Item 4) and washers (Figure 1, Item 5) behind main mounting
bracket (Figure 1, Item 6). Discard self-locking nuts (Figure 1, Item 4).
3.
Remove four screws (Figure 1, Item 7), support bracket (Figure 1, Item 1), and gravel guard
(Figure 1, Item 2) from main mounting bracket (Figure 1, Item 6).
2
1
3
4
5
6
7
466-0074a
Figure 1.
Gooseneck Gravel Guard Removal.
END OF TASK
0075-1
02/13/2013root(maintwp)wpno(M1043)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.