• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Unknown' by Unknown - Page 353 of 648
'Unknown' by Unknown - Page 355 of 648

Field Maintenance Manual For Semitrailer, Medium Heavy Equipment Transporter, 40 Ton, M870A3
Page Navigation
  309    310    311    312    313  314  315    316    317    318    319  
img
.
TM 5-2330-325-13&P
0076
REMOVAL
1.
Release all pressure from hydraulic lines by disconnecting gooseneck hydraulics from power.
CAUTION
Cap or plug all ports and hose ends to prevent contamination of hydraulic oil. Failure to
comply may result in damage to, or destruction of, equipment or mission.
NOTE
Tag all wires, hoses, tubing, and connections prior to removal for ease of installation.
2.
Disconnect five hydraulic lines (Figure 1, Item 4) from rear and side of control valve (Figure 1, Item 1) inlet
and outlet ports and cap or tape closed openings in ports and lines.
3.
Tag and disconnect hydraulic line (Figure 1, Item 3) from pressure gage (Figure 1, Item 2).
4.
Loosen and remove three mounting bolts (Figure 1, Item 5), washers (Figure 1, Item 6), and self-locking
nuts (Figure 1, Item 7) securing hydraulic control valve (Figure 1, Item 1) to gooseneck and remove control
valve (Figure 1, Item 1) and pressure gage (Figure 1, Item 2). Discard self-locking nuts (Figure 1, Item 7).
5.
Loosen and separate pressure gage (Figure 1, Item 2) from control valve (Figure 1, Item 1).
1
2
5, 6, 7
4
3
4
4
466-0085
Figure 1.
Hydraulic Control Valve and Pressure Gage Replacement.
END OF TASK
DISASSEMBLY
Remove all fittings from hydraulic control valve.
END OF TASK
0076-2
02/13/2013root(maintwp)wpno(M1044)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.