TM 5-2330-325-13&P
0064
INSTALLATION - Continued
4.
Install air reservoir (Figure 5, Item 2) and two new gaskets (Figure 5, Item 8) on semitrailer frame
(Figure 5, Item 1) with four bolts (Figure 5, Item 9), eight washers (Figure 5, Item 7), and four new
self-locking nuts (Figure 5, Item 6).
5.
Apply antiseizing tape to threads of elbow (Figure 5, Item 4) and install elbow on air reservoir
(Figure 5, Item 2).
6.
Connect air hose (Figure 5, Item 3) to elbow (Figure 5, Item 4).
7.
Remove tape from reservoir outlet (Figure 5, Item 5) to spring brake control valve.
4
1
9
3
2
7
5
FRONT OF
VEHICLE
6
7
8
466-0068b
Figure 5.
Front Reservoir Replacement.
END OF TASK
FOLLOW ON TASK
1.
2.
3.
Perform air reservoir serviceability test (WP 0066).
END OF TASK
END OF WORK PACKAGE