• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3-28. Cab Frame Rail Sleeve Bushings Installation.
WHEEL WELL ARMOR INSTALLATION - Continued

Crew Protection Kit For Truck, Tractor, M1070P1, 8X8 Heavy Equipment Transporter Page Navigation
  244    245    246    247    248  249  250    251    252    253    254  
img
. . . .
M1070 HET ARMOR KIT
II113400
Rev. D
4. Pre-assemble upper wheel well panel as follows (see Figure 3-29):
a. Install one 90-degree joiner bracket (1) onto upper wheel well panel (2) and secure with three flat washers
(3) and locknuts (4). Do not tighten locknuts.
2
4
3
1
Figure 3-29. Upper Wheel Well Panel Pre-Assembly.
5. Match-drill cab frame rail as follows (see Figure 3-30):
INSTALLATION 3-59
JUNE 2005


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.