• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3-27. Match-Drill Cab Frame Rail.
Figure 3-29. Upper Wheel Well Panel Pre-Assembly.

Crew Protection Kit For Truck, Tractor, M1070P1, 8X8 Heavy Equipment Transporter Page Navigation
  243    244    245    246    247  248  249    250    251    252    253  
img
. . . .
M1070 HET ARMOR KIT
II113400
Rev. D
3. Install cab frame rail sleeve bushings as follows (see Figure 3-28):
a. Install two sleeve bushings (1) and secure each with one bolt (2), two flat washers (3), and
one locknut (4). Torque locknuts to 35 lb-ft.
3
4
2
1
3
Figure 3-30 Lower Wheel Well Panel Installation
Figure 3-28. Cab Frame Rail Sleeve Bushings Installation.
INSTALLATION 3-58
JUNE 2005


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.