• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REAR ARMOR INSTALLATION - Continued
LEFT SIDE PANEL ARMOR INSTALLATION

Crew Protection Kit For Truck, Tractor, M1070P1, 8X8 Heavy Equipment Transporter Page Navigation
  221    222    223    224    225  226  227    228    229    230    231  
img
. .
M1070 HET ARMOR KIT
II113400
Rev. D
6
5
8
7
6
5
3
5
4
Match-drill holes through frame
using drill bushings (1) and (2).
2
1
Figure 3-17. Match-Drill of Cab Frame Rail.
INSTALLATION 3-31/(3-32 Blank)
JUNE 2005


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.