• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7-10. Shift Tower Installation.
Figure 7-11. Shift Tower Installation (M916-A1).

Crew Protection Kit For M915A3P1,M915A2P1, M916A3P1, M917A2P1, M915A4P1, M917A1P1, M916A1P1, And M916A2P1 - 1 Page Navigation
  268    269    270    271    272  273  274    275    276    277    278  
img
. . . . . . . .
Freightliner M915 / M916 -
Installation Manual P/N 0257550622-00
Crew Protection Kit
(Doc No.: II113500-1 D)
7.6 Shift Tower Installation (M916-A1 Only)
This procedure may be performed anytime after Step 5.4 in the installation process.
7.6.1 Parts, Fasteners, Special Tools, and Materials
Parts (see Figure 7-11):
Alternate
Find No. in
Part No.
Part No.
Description
Procedure
Quantity
113509-1
Adapter, Shift Tower
#509
1
Fasteners: (see Figure 7-11)
Find No.
(Table 3-5)  Description
Size
Quantity
4
Bolt (these bolts were temporarily used in step 5)
5/16" x 1-1/4"
5
25
Flat Washer
5/16"
5
56
Screw, Button Head Cap
1/4" x 1/2"
8
32
Flat Washer
1/4"
8
Special Tools:
Description
Vendor/Part-Number
8.6.2 Installation Instructions
1. Bolt the shift tower adapter #509 to the Center Floor Armor # 815.
2. Feed the shifter cable up through the modified square hole in the center floor panel and
the adapter plate. Re-attach the shift cable to the shift tower and bolt the shift tower to the
shift tower adapter part #509 (see Figure 7-11). Apply thread-locking compound to the
screws.
3. Feed the transfer case cable up through the hole cut in the center floor panel #815 and
adapter plate #509. Re-attach the transfer case cable to the transfer case shifter and
fasten the shifter (not shown) to the adapter plate part #509 using the four holes indicated
in Figure 7-11 and four more Screws 56 and Flat washers 32. Apply thread-locking
compound to the screws.
Page 121 of 125


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.