• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7-11. Shift Tower Installation (M916-A1).
Figure 7-12. Mounting Plate Installation.

Crew Protection Kit For M915A3P1,M915A2P1, M916A3P1, M917A2P1, M915A4P1, M917A1P1, M916A1P1, And M916A2P1 - 1 Page Navigation
  270    271    272    273    274  275  276    277    278    279    280  
img
. . . . . .
Freightliner M915 / M916 -
Installation Manual P/N 0257550622-00
Crew Protection Kit
(Doc No.: II113500-1 D)
7.7 Rear Wall Mounting Plate (M915-A2 and M916-A1)
This step should be performed after Step 5-11 and prior to Step 5-17 in the main installation sequence.
7.7.1 Parts, Fasteners, Special Tools, and Materials
Parts (see Figure 7-12):
Alternate
Find No. in
Part No.
Part No.
Description
Procedure
Quantity
113507-1
Plate, Mounting
#507
1
Fasteners: (see Figure 7-12)
Find No.
(Table 3-5)  Description
Size
Quantity
4
Bolt
5/16" x 1-1/4"
6
58
Screw, self tapping
#10
16
Special Tools:
Description
Vendor/Part-Number
No 21 drill bit (0.159" Diameter)
8.7.2 Installation Instructions
1. Remove the six bolts indicated in Figure 7-12 and install part #507 using new bolts (4) and
existing washers. Apply thread-locking compound to the screws.
2. Original Equipment Manufacturer (OEM) components that were displaced from the rear
wall may now be mounted to this plate. Simply transfer the mounting hole pattern for
each component to the plate and drill a 0.159" (No. 21) hole for each mark. Secure the
component with #10 x " self tapping screws (58).
Page 123 of 125


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.