TM 9-2320-302-20
0130 00-4
DRIVELINE U-JOINTS AND BEARINGS REPLACEMENT - CONTINUED
0130 00
MAIN DRIVELINE U-JOINTS INSTALLATION - CONTINUED
3.
Install two new screws (14) on each of two bearing caps (15). Tighten screws to 36 lb-ft (49 Nm).
4.
Install two bearings (12) on universal joint (13).
5.
Install retaining wire (11) in groove of two bearings (12).
6.
Lubricate universal joint (13) (WP 0021 00).
NOTE
Perform the following steps at front end of main driveline.
7.
Install grease fitting (10) on yoke (6).
NOTE
Align matchmarks on each half of main driveline.
8.
Install dust seal (9) and yoke (6) on main driveline (7). Tighten dust seal.
9.
Install two grease fittings (8) on universal joint (3).
10.
Position universal joint (3) and two bearing caps (5) on main driveline (7).
11.
Install two new screws (4) on each of two bearing caps (5). Tighten screws to 36 lb-ft (49 Nm).
12.
Install two bearings (2) on universal joint (3).
13.
Install retaining wire (1) in groove of two bearings (2).
14.
Lubricate yoke (6) and universal joint (3) (WP 0021 00).
15.
Install main driveline (WP 0129 00).
12
11
13
16
12
14
15
7
9
6
10
2
1
4
5
8
3
2
