TM 5-2330-325-13&P
0085
ASSEMBLY - Continued
8.
Install four ball studs (Figure 2, Item 9) and secure with four new self-locking nuts (Figure 2, Item 10) and
eight washers (Figure 2, Item 8).
9.
Install pneumatic cylinders (Figure 2, Item 13) onto ball studs (Figure 2, Item 9) by pushing ends of cylinders
over ball studs. Install four safety clips (Figure 2, Item 12).
END OF TASK
INSTALLATION
Install tool box (Figure 2, Item 17) onto gooseneck with six bolts (Figure 2, Item 16), flat washers
(Figure 2, Item 15), and new self-locking nuts (Figure 2, Item 14).
1
5
2
3
6
4
7 8
9
20
6
19
11
12
18
10
8
13
17
12
9
16
8
15
15
10
14
8
466-0090a
Figure 2.
Tool Box Repair.
END OF TASK
END OF WORK PACKAGE
02/13/2013root(maintwp)wpno(M1053)