• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3-10. Roof Panel Mounting Studs and Spacers Installation.
REAR ARMOR INSTALLATION

Crew Protection Kit For Truck, Tractor, M1070P1, 8X8 Heavy Equipment Transporter Page Navigation
  207    208    209    210    211  212  213    214    215    216    217  
img
. . .
M1070 HET ARMOR KIT
II113400
Rev. D
3. Install roof panel as follows (see Figure 3-11):
a. Using appropriate lifting device, hardware, and personnel, lift roof panel assembly into position on top of
cab roof. Verify equal spacing between roof panel and side gutters once in place.
b. Apply urethane sealant in 12 holes around protruding bolts and secure the roof panel assembly to the cab
using six flat washers (1), six locknuts (2), twelve flat washers (3), and twelve locknuts (4). Torque six
locknuts (2) to 9 lb-ft. Torque twelve locknuts (4) to 35 lb-ft.
c. Remove one jam nut from each of the seven stud plates on the roof panel once the roof panel has been
placed into position.
4
5
2
5
3
5
1
5
Figure 3-11. Roof Panel Installation.
INSTALLATION 3-17
JUNE 2005


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.