TB 9-2320-302-13&P-1
DOOR BALLISTIC GLASS AND FRAME ASSEMBLY REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Conditions - Continued
Maintenance Level
Unit
(M915A4P1)
Tools and Special Tools
Vehicle parked on level ground (TM 9-2320-303-
10)
Parking/Emergency Brake applied (TM 9-2320-
Materials/Parts
303-10)
Engine off (TM 9-2320-303-10)
References
Battery Disconnect Switch in OFF position (TM 9-
2320-303-10)
Outside Door Mirror removed (TM 9-2320-303-24-
Personnel Required
1)
Two
(M915A2P1, M916A1P1, M916A2P1, and
M917A1P1)
Equipment Conditions
Vehicle parked on level ground (TM 9-2320-363-
(M915A3P1, M916A3P1, and M917A2P1)
10)
Vehicle parked on level ground (TM 9-2320-302-
Parking/Emergency Brake applied (TM 9-2320-
10)
363-10)
Parking/Emergency Brake applied (TM 9-2320-
Engine off (TM 9-2320-363-10)
302-10)
If equipped, Battery Disconnect Switch in OFF
Engine off (TM 9-2320-302-10)
position (TM 9-2320-363-10), otherwise, discon-
nect battery cables (TM 9-2320-363-20-2)
Battery Disconnect Switch in OFF position (TM 9-
2320-302-10)
Outside Door Mirror removed (TM 9-2320-363-20-
Outside Door Mirror removed (TM 9-2320-302-20)
2)
N OT E
The following procedure is for right side door ballistic glass and frame. Use same procedure for left side
door ballistic glass and frame.