• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HEAVY-DUTY WINCH CONTROL VALVE REMOVAL/INSTALLATION - Continued
HEAVY-DUTY WINCH CABLE REMOVAL/INSTALLATION

Truck, Tractor, Light Equipment Transporter, 8X8 M983A2 Let Page Navigation
  483    484    485    486    487  488  489    490    491    492    493  
img
.
TB 9-2320-279-13&P-4
0073
FIELD MAINTENANCE
EQUALIZER BEAM ASSEMBLY (REAR TANDEM) REMOVAL/REPAIR/INSTALLATION
INITIAL SETUP:
Not Applicable
NOTE
For removal/repair/installation of the equalizer beam assembly, refer to "Equalizer Beam
Assembly (Rear Tandem) Removal/Repair/Installation" in TM 9-2320-315-14&P. Substitute
the following Step for Step (6) in the "Installation" section.
1. Lubricate threads of two screws (7) with oil and install four washers (8), two beam end adapters (6), screws,
and nuts (9) in each equalizer beam (1). Tighten nuts to 445 to 495 lb-ft (603 to 671 Nm).
END OF TASK
END OF WORK PACKAGE
0073-1/(2 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.