• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HEAVY-DUTY WINCH CONTROL VALVE REMOVAL/INSTALLATION - Continued
EQUALIZER BEAM ASSEMBLY (REAR TANDEM) REMOVAL/REPAIR/INSTALLATION

Truck, Tractor, Light Equipment Transporter, 8X8 M983A2 Let Page Navigation
  482    483    484    485    486  487  488    489    490    491    492  
img
.
TB 9-2320-279-13&P-4
0072
FOLLOW-ON MAINTENANCE
1. Connect batteries (refer to TM 9-2320-315-14&P).
2. Check hydraulic fluid level (refer to TM 9-2320-315-14&P).
3. Start engine (refer to TM 9-2320-279-10).
4. Check hydraulic system for leaks (refer to TM 9-2320-315-14&P).
5. Check operation of heavy-duty winch. (WP 0015)
6. Shut OFF engine (refer to TM 9-2320-279-10).
7. Remove wheel chocks (refer to TM 9-2320-279-10).
END OF WORK PACKAGE
0072-15/(16 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.