TB 9-2320-279-13&P-4
0072
13
7
24
25
22
20
23
21
19
Figure 10.
3. Lightly lubricate preformed packing (25) with clean oil and install preformed packing (25) and fitting (7) on control
valve (22).
4. Lightly lubricate preformed packing (24) with clean oil and install preformed packing (24) and fitting (13) on
control valve (22).
5. Install control valve (22) on bracket (23) with three screws (20), washers (21) and locknuts (19).
6. Lightly lubricate preformed packing (18) with clean oil and install preformed packing (18) and fitting (17) on fitting
(16).