Home
Download PDF
Order CD-ROM
Order in Print
HEAVY-DUTY WINCH CONTROL VALVE REMOVAL/INSTALLATION - Continued
HEAVY-DUTY WINCH CONTROL VALVE REMOVAL/INSTALLATION - Continued
Truck, Tractor, Light Equipment Transporter, 8X8 M983A2 Let
Page Navigation
476
477
478
479
480
481
482
483
484
485
486
TB
9-2320-279-13&P-4
0072
10
26
16
27
22
Figure
9.
2.
Lightly
lubricate
preformed
packing
(26)
with
clean
oil
and
install
preformed
packing
(26)
and
fitting
(10)
on
control
valve
(22).
0072-9