• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WINCH CONTROL VALVE WIRE HARNESS REMOVAL/INSTALLATION - Continued
WINCH CONTROL STATION BRACKET REMOVAL/INSTALLATION

Truck, Tractor, Light Equipment Transporter, 8X8 M983A2 Let Page Navigation
  358    359    360    361    362  363  364    365    366    367    368  
img
. .
TB 9-2320-279-13&P-4
0049
10. Connect connector SV11 (3) to pay out coil (4).
2
1
3
4
Figure 10.
11. Connect connector SV10 (1) to reel in coil (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1. Connect batteries (refer to TM 9-2320-315-14&P).
2. Start engine (refer to TM 9-2320-279-10).
3. Check operation of heavy-duty winch. (WP 0015)
4. Shut OFF engine (refer to TM 9-2320-279-10).
5. Remove wheel chocks (refer to TM 9-2320-279-10).
END OF WORK PACKAGE
0049-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.