TB 9-2320-279-13&P-4
0049
10. Connect connector SV11 (3) to pay out coil (4).
2
1
3
4
Figure 10.
11. Connect connector SV10 (1) to reel in coil (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1. Connect batteries (refer to TM 9-2320-315-14&P).
2. Start engine (refer to TM 9-2320-279-10).
3. Check operation of heavy-duty winch. (WP 0015)
4. Shut OFF engine (refer to TM 9-2320-279-10).
5. Remove wheel chocks (refer to TM 9-2320-279-10).
END OF WORK PACKAGE