TM 9-2320-273-20
9-9. AUXILIARY AIR-POWERED COMPONENT SYSTEMS MAINTENANCE TASK SUMMARY
(Continued).
LIST OF TASKS
TASK
TASK
TROUBLESHOOTING
NO.
TASK
REF
REF (TABLE)
2.
Windshield Washer Control Maintenance
(Continued):
c.
Installation.
9-41 C
d.
Operational Check.
9-41 D
3.
Windshield Wiper Motor Maintenance:
9-42
9-1
a.
Removal.
9-42A
b.
Installation.
9-42B
c.
Operational Check.
9-42C
4.
Windshield Wiper Control Maintenance:
9-43
9-1
a.
Removal.
9-43A
b.
Inspection of Air Lines.
9-43B
c.
Installation.
9-43C
d.
Operational Check.
9-43D
5.
Differential Lockup Control Valve Maintenance:
9-44
9-1
a.
Removal.
9-44A
b.
Installation.
9-44B
c.
Checking for Leaks.
9-44C
6.
Air Horn and Control Valve Maintenance:
9-45
9-1
a.
Removal.
9-45A
b.
Installation.
9-45B
c.
Operational Check.
9-45C
9-27