TM 9-2320-273-20
9-1
9-8. BRAKE SYSTEM MAINTENANCE TASK SUMMARY (Continued).
LIST OF TASKS
TASK
TASK
TROUBLESHOOTING
NO.
TASK
REF
REF (TABLE)
2.
Trailer Hand Brake Valve (Continued):
b.
Inspection of Air Lines and Fittings.
9-18B
c.
Installation.
9-18C
d.
Operational Check.
9-18D
3.
Parking Brake Valve:
9-19
a.
Removal.
9-19A
b.
Inspection of Lines and Fittings.
9-19B
c.
Installation.
9-19C
d.
Operational Check.
9-19D
4.
Air Pressure Gages Maintenance:
9-20
a.
Removal.
9-20A
b.
Installation.
9-20B
c.
Operational Check.
9-20C
5.
Brake Pedal and Valve Maintenance:
9-21
a.
Pedal Removal.
9-21A
b.
Valve Removal.
9-21B
c.
Valve Installation,
9-21C
d.
Pedal Installation.
9-21D
e.
Operational Check.
9-21E
6.
Service Brakes Quick Release Valve:
9-22
a.
Removal.
9-22A
b.
Installation
9-22B
c.
Operational Check.
9-22C
7.
Quick-Releasel/Double-Check Valve Maintenance
9-23
9-1
a.
Removal.
9-23A
b.
Installation.
9-23B
c.
Operational Check.
9-23C
9-1
9-1
9-1
9-21