TM 9-2320-273-20
9-8. BRAKE SYSTEM MAINTENANCE TASK SUMMARY (Continued).
LIST OF TASKS
TASK
TASK
TROUBLESHOOTING
No.
TASK
REF
REF (TABLE
8.
Relay Valve Maintenance :
9-24
9-1
a.
Removal.
9-24A
b.
Installation.
9-24B
c.
Checking for Leaks.
9-24C
9.
Limiting Valve Maintenance :
9-25
9-1
a.
Removal,
9-25A
b.
Installation.
9-25B
c.
Operational Check.
9-25C
10.
Tractor Protection Valve Maintenance:
9-26
9-1
a.
Removal.
9-26A
b.
Installation.
9-26B
c.
Operational Check.
9-26C
11.
Double Check Valve Maintenance :
9-27
9-1
a.
Removal.
9-27A
b.
Installation,
9-27B
c.
Checking for Leaks.
9-27C
12.
Double Check and Stoplamp Valve Maintenance
9-28
9-1
(M918 and M919):
a.
Removal.
9-28A
b.
Installation.
9-28B
c.
Operational Check.
9-28C
13.
Double Check and Stoplamp Valve Maintenance
9-29
9-1
(M915, M916, M917, M920) :
a.
Removal.
b.
Installation.
9-29A
Operational Check.
9-29B
c.
9-29C
9-22