• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3-1. Slinging and Tie Down Chart
TABLE 4-1. HYSTER-CARE MAINTENANCE SCHEDULE.

Maintenance Manual For Trailer, Flatbed, 15 Ton Payload Multi Axle
Page Navigation
  4    5    6    7    8  9  10    11    12    13    14  
img
. . .
4-1. GENERAL.
4-6. Table 4-1. Iists the recommended mainten-
a n c e checks.  It is outlined in two schedules: the
4-2. This section contains instructions necessary
mileage schedule and the periodic schedule.
Per-
for proper HYSTER-CARE Maintenance of HYSTER
form maintenance on the basis of whichever occurs
t r a i l e r s .  HYSTER-CARE  Maintenance  is  divided
first.
i n t o two subsections:
H Y S T E R - C A R E  Mainten-
a n c e Schedule and HYSTER-CARE Maintenance
4-7. The first
column of the maintenance
Procedures.
T h e maintenance schedule lists the
table 4-1 should be used to locate the applicable
recommended di stance/time intervals between main-
maintenance  procedure and illustration.  Figure 4-1
tenance checks.
The procedure subsection provides
shows the maintenance points for the various series.
detailed instructions for performing the maintenance
checks.
The instructions listed in the procedures
subsection are given by systems and are not nec-
4-10. AIR LINE SYSTEM.
essarily in the order listed in Table 4-1.
4-11. AIR SYSTEM TESTS.
4-3. HYSTER-CARE MAINTENANCE
SCHEDULE.
4-12. A test series should be run every day before
operating trailer.
4-4. GENERAL.
4-5.
HYSTER-CARE Maintenance is a planned
program that includes periodic inspection and lub-
rication.
FIGURE 4-1. HP SERIES MAINTENANCE CHECKPOINTS.
4-1.
HYSTER COMPANY 1978


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.