• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HOOK-UP PROCEDURE - UNITS WITH AIR BRAKES.
FIGURE 4-1. HP SERIES MAINTENANCE CHECKPOINTS.

Maintenance Manual For Trailer, Flatbed, 15 Ton Payload Multi Axle
Page Navigation
  3    4    5    6    7  8  9    10    11    12    13  
img
.
e. Lock the platform.
c. Drive the load clear of the bed.
d. Stand on the bed frame front channel unti l the
3 - 3 5 .  SLINGING AND TIE DOWN
INSTRUCTIONS .  ( s e e F i g u r e 3 - 1 ) .
bed contacts the tongue.
3-2.


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.