TM 5-2330-325-14&P
4-50.
GLADHAND REPLACEMENT (Continued).
c.
Inspection and Replacement.
(1)
Inspect gladhand body for damaged threads, cracks, dents, holes and warps.
(2)
Replace defective gladhand.
(3)
d.
Packing Ring Installation.
(1)
Clean packing ring groove in gladhand.
(2)
Partially collapse ring with fingers and insert one side of ring flange into groove.
(3)
Push ring into place. Face of ring must lie flat with no twist or bulge.
e.
Installation.
(1)
Position gladhand (4) on gooseneck and secure with three bolts (1), washer (2), and nuts
(3).
(2)
Apply anti-seize tape to threads of gladhand (4) and air line coupling and connect air line to
gladhand.
FOLLOW-ON TASKS:
None.
4-59