TM 5-2330-325-14&P
Section III. OPERATOR MAINTENANCE
Paragraph
Page
Number
Paragraph Title
Number
General ............................................................................................................................. 3-8
Electrical Connectors ....................................................................................................... 3-8
Gladhands ........................................................................................................................ 3-9
Air Reservoir Service Check ........................................................................................... 3-10
Tire Assembly Replacement ........................................................................................... 3-11
Spare Tire Assembly ...................................................................................................... 3-14
Kingpin Replacement ..................................................................................................... 3-15
Cleaning ......................................................................................................................... 3-16
Paragraphs 3-5 through 3-11 are the only maintenance procedures performed by
the operator.
Required lubrication is specified in Chapter 3, Section I.
a.
Cleaning.
WARNING
Remove all power to trailer prior to making any repairs on the electrical
system. Failure to do so may result in serious injury or death.
(1)
Disconnect inter-vehicular electrical cables (1) and (2) from prime mover to trailer and from
trailer to gooseneck (3).
(2)
Use a rag (item 15, Appendix F) to remove any build up of grease or dirt from exterior of
connector and receptacle. Allow to dry.
(3)
Allow to dry.
b.
Inspection.
(1)
Inspect connector and pins for damage.
(2)
Notify Unit Maintenance if any damage is found.