• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Unknown' by Unknown - Page 169 of 648
'Unknown' by Unknown - Page 171 of 648

Field Maintenance Manual For Semitrailer, Medium Heavy Equipment Transporter, 40 Ton, M870A3
Page Navigation
  125    126    127    128    129  130  131    132    133    134    135  
img
. . .
TM 5-2330-325-13&P
0033
Table 1.
Operator Preventive Maintenance Checks and Services (PMCS) Procedures - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
WARNING
35
After
Hubs
Hub may be hot. Before putting hand to
hub, hold hand close to hub to check for
excessive heat radiation. This will prevent
skin burns caused by hot metal. Failure to
comply may result in death or injury to
personnel. Seek medical attention in the
event of an injury.
Check hubs for discoloration or blistered paint that may Excessive heat, indicating
indicate excessive heat condition.
worn wheel bearing.
36
After
Air System
Open dump valve to vent accumulated moisture.
37
Weekly
Gooseneck
Inspect grease points for damage to fittings and
sufficient grease (WP 0093).
38
Weekly
Kingpin
Apply grease to kingpin (WP 0093).
39
Weekly
Pickup Plate
Lubricate pickup plate (WP 0093).
NOTE
40
Monthly
Hydraulics
If semitrailer will not be used for 72 hours or
more, completely drain air tanks.
Lightly coat exposed cylinders with grease.
END OF TASK
END OF WORK PACKAGE
0033-6
02/13/2013root(pmcswp)wpno(I1002)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.