• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LEFT SIDE "A" PILLAR ARMOR INSTALLATION
Figure 3-59. Left Side Panels Pre-Assembly.

Crew Protection Kit For Truck, Tractor, M1070P1, 8X8 Heavy Equipment Transporter Page Navigation
  294    295    296    297    298  299  300    301    302    303    304  
img
. . .
M1070 HET ARMOR KIT
II113400
Rev. D
a. Installation
1. Pre-assemble left side panels as follows (see Figure 3-59):
NOTE
Ensure door hinge (3) is oriented as shown in Figure 3-59.
Align holes marked "A" with drill bushings.
a. Align left forward side panel (1) with left forward side panel (2) and install door hinge (3) and
hinge bracket (4) and secure with 12 bolts (5), flat washers (6), locknuts (7), one bolt (8),
one flat washer (6), and one locknut (7). Torque locknuts to 35 lb-ft.
b.
Install armor step bracket (9) and secure with two bolts (8), four flat washers (6), and
two locknuts (7). Torque locknuts to 35 lb-ft.
c. Install one 90-degree joiner bracket (10) and secure with three flat washers (6) and locknuts (7). Do not
tighten locknuts at this time.
d. Install hood clamping catch (retained from Teardown, Chapter 2) and secure with two bolts (11),
four flat washers (12), and two locknuts (13). Torque locknuts to 9 lb-ft.
e. Apply trim seal (14) to the assembly from the top of the hinge bracket (4) to the top of the left forward
side panel (1).
INSTALLATION 3-112
JUNE 2005


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.