TB 9-2320-360-13&P-1
A/C KIT INSTALLATION - CONTINUED
0003 00
FINAL COMPONENT ASSEMBLY - CONTINUED
0003 00
(14)
Route #6 A/C hose (49) from shutoff valve, #8 A/C hose (50) from A/C compressor, and A/C compressor
receiver/dryer harness (23) through right-hand baffle (48) to A/C condenser assembly (51).
HETF00421
(15)
Connect A/C compressor receiver/dryer harness high-pressure switch (52) connector and binary switch
(53) connector.
(16)
Coat #6 O-ring (54) and #8 O-ring (57) with refrigerant compressor oil.
(17)
Install #6 O-ring (54) in hose connector (55) of #6 A/C hose (49).
N OT E
Ensure #6 A/C hose is installed in eleven o'clock position.
(18)
Install #6 A/C hose (49) to compressor receiver/dryer (56).
(19)
Install #8 O-ring (57) in hose connector (58) of #8 A/C hose (50).
(20)
Install #8 male shutoff valve (59) to #8 A/C hose (50).
(21)
Coat #8 O-ring (60) with refrigerant compressor oil.
(22)
Install #8 O-ring (60) in #8 male shutoff valve (59).
(23)
Connect #8 shutoff valves (45 and 59).
(24)
Install cushion clamp (61) on #8 A/C hose (50) and secure to condenser assembly (51) with screw (62) and
locknut (63), provided with the kit.
HETF00422
0003 00-46