TB 9-2320-302-13&P-2
Option Two: 2-man lift
1.) Rather than using a forklift use a two
man lift to hoist B-Pillar.
2.) Hoist the armor into position, guiding
the four 3/8" threaded studs into their
mating slots in the Rear Cab Armor
Frame. Secure the studs with the pro-
1.) Thread the provided eyebolts into the
and hex nuts.
top angle rail of the Driver Side B-Pillar
NOTE: The hex nuts should only be
Armor Frame. These eyebolts can be
finger-tight at this time.
used to attach a lifting strap from the ar-
mor frame to a forklift or overhead crane.
3.) Align the slotted tabs on the top and
2.) Hoist the armor into position, guiding
bottom of the forward side of the armor
the four 3/8" threaded studs into their
frame with the mating slotted tabs on the
mating slots in the Rear Cab Armor
Door Support Frame. Use the provided
Frame. Secure the studs with the pro-
3/8" bolts, flat washers, and metal lock-
nuts to secure the tabs.
and hex nuts.
NOTE: Do not fully tighten the lock
NOTE: The hex nuts should only be
nuts at this time.
finger-tight at this time.
3.) Align the slotted tabs on the top and
bottom of the forward side of the armor
frame with the mating slotted tabs on the
Door Support Frame. Use the provided
3/8" bolts, flat washers, and metal lock-
nuts to secure the tabs.
ArmorWorks
0038 00-39