TB 9-2320-302-13&P-2
LEFT B-PILLAR ARMOR REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Conditions - Continued
Maintenance Level
Unit
(M915A3P2, M916A3P2, and M917A2P2) -
Continued
Tools and Special Tools
Engine OFF (TM 9-2320-302-10)
Battery Disconnect Switch in OFF position (TM 9-
2320-302-10)
(M915A4P2)
Lifting Device (500-lb Minimum Capacity)
Vehicle parked on level ground (TM 9-2320-303-
Materials/Parts
10)
Parking/Emergency Brake applied (TM 9-2320-
Locknut (2)
303-10)
Lockwasher (10)
Engine OFF (TM 9-2320-303-10)
Rivet (2)
Battery Disconnect Switch in OFF position (TM 9-
2320-303-10)
Personnel Required
Two
(M915A2P1, M916A1P1, M916A2P1, and
M917A1P1)
References
Vehicle parked on level ground (TM 9-2320-363-
10)
Equipment Conditions
Parking/Emergency Brake applied (TM 9-2320-
363-10)
(M915A3P1, M916A3P1, and M917A2P1)
Engine OFF (TM 9-2320-363-10)
Vehicle parked on level ground (TM 9-2320-302-
10)
If equipped, Battery Disconnect Switch in OFF
Parking/Emergency Brake applied (TM 9-2320-
position (TM 9-2320-363-10), otherwise, discon-
302-10)
nect Battery Cables (TM 9-2320-363-20-2)