TB 9-2320-302-13&P-2
DOOR HANDLE REPLACEMENT - CONTINUED
0013 00
CLEANING AND INSPECTION
Clean and inspect all parts IAW General Maintenance Instructions (WP 0011 00).
INSTALLATION
1.
Install internal door handle (9) and two new cotter pins (8) on door assembly (7).
2.
Install internal mounting plate (10), external mounting plate (5), and two bolts on door assembly (7). Center plate hole
on internal bolt hole before tightening bolts.
3.
Install external door handle (4), three new lockwashers (2), washers (3), and bolts (1) on external mounting plate (5).
4.
END OF WORK PACKAGE
0013 00-3/(0013 00-4 Blank)