• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5-35. Roof Kit Installation Right Rear (3 of 10).
Figure 5-41. Roof Kit Installation - RT Top A-Pillar (9 of 10).

Crew Protection Kit For M915A3P1,M915A2P1, M916A3P1, M917A2P1, M915A4P1, M917A1P1, M916A1P1, And M916A2P1 - 1 Page Navigation
  196    197    198    199    200  201  202    203    204    205    206  
img
. . . . . . .
Freightliner M915 / M916 -
Installation Manual P/N 0257550622-00
Crew Protection Kit
(Doc No.: II113500-1 D)
Figure 5-37. Roof Kit Installation
Figure 5-38. Roof Kit Installation
Upper Aft Corner (5 of 10).
Forward Section (6 of 10).
Figure 5-39. Roof Kit Installation -
Figure 5-40. Roof Kit Installation -
Left Rear Corner (7 of 10).
Right rear Corner (8 of 10).
9. Install the rear roof corners # 801 in each of the aft corners as indicated in Figures 5-39 and
5-40.
10. Position spacer #954 against the A-Pillar armor panel #251. Place the top A-pillar plate
#254 on top of the spacer. Insert the forward fastener through the forward hole in #954,
through the large-diameter hole in the spacer #954 and engage with the uppermost
threaded insert in the A-pillar armor panel #251. Insert the two aft fasteners through the
upper A-pillar plate and engage with the side armor panel #213 as shown in Figure 5-41.
Page 49 of 125


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.