Figure 6.
5. Install air line 2338 (5) on fitting (6).
6. Install air line 2921 (3) on fitting (4).
7. Install air line 2231 (1) on fitting (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1. Start engine and build air pressure to 120 to 125 psi (827 to 862 kPa) (refer to TM 9-2320-279-10).
2. Check air system for leaks (refer to TM 9-2320-315-14&P).
3. Check operation of heavy-duty winch. (WP 0015)
4. Shut OFF engine (refer to TM 9-2320-279-10).
5. Remove wheel chocks (refer to TM 9-2320-279-10).
END OF WORK PACKAGE