TB 9-2320-279-13&P-4
0055
6
5
4
3
2
1
Figure 6.
5. Install air line 2706 (3) on fitting (4).
6. Install air line 2921 (1) on fitting (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1. Start engine and build air pressure to 120 to 125 psi (827 to 862 kPa) (refer to TM 9-2320-279-10).
2. Check air system for leaks (refer to TM 9-2320-315-14&P).
3. Check operation of heavy-duty winch. (WP 0015)
4. Shut OFF engine (refer to TM 9-2320-279-10).
5. Remove wheel chocks (refer to TM 9-2320-279-10).
END OF WORK PACKAGE