TB 9-2320-279-13&P-2
LEFT SIDE BLAST DEFLECTOR REPLACEMENT - CONTINUED
0028 00
CLEANING AND INSPECTION
Clean and inspect all parts IAW General Maintenance Instructions (WP 0011 00).
INSTALLATION
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death to per-
sonnel.
N OT E
Side blast deflector weighs 145 lb (66 kg).
Position notch on inside edge of blast deflector in front of operator compartment support.
1.
Attach and secure lifting device under side blast deflector (5). Move side blast deflector into position under vehicle.
2.
Install four washers (6) and bolts (7) on left side blast deflector (5) into threaded plate (4) in fender support (3). Hand
tighten bolts.
3.
Install spacer (15), four washers (1), and bolts (2) on left side blast deflector (5).
4.
Install shield (14), spacer (13), four washers (11), and new locknuts (12) on left side blast deflector (5). Hand tighten
locknuts.
N OT E
Bolt lengths are not the same. Ensure bolts are installed as tagged.
5.
Install six bolts (8), washers (9), and new locknuts (10) on left side blast deflector (5). Hand tighten locknuts.
6.
Tighten four bolts (7) to 80 lb-ft (109 Nm).
7.
Tighten three 3/4 inch locknuts (10) on left side blast deflector (5) to 280 lb-ft (380 Nm).
8.
Tighten three 1/2 inch locknuts (10) on left side blast deflector (5).
9.
Tighten four locknuts (12) on left side blast deflector (5) to 280 lb-ft (380 Nm).
10.
Install left step (TM 9-2320-279-20).
END OF WORK PACKAGE
0028 00-3/(0028 00-4 Blank)