TB 9-2320-279-13&P-2
RIGHT SIDE BLAST DEFLECTOR REPLACEMENT - CONTINUED
0027 00
CLEANING AND INSPECTION
Clean and inspect all parts IAW General Maintenance Instructions (WP 0011 00).
INSTALLATION
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death to per-
sonnel.
N OT E
Side blast deflector weighs 145 lb (66 kg).
Position notch on inside edge of blast deflector in front of operator compartment support.
1.
Attach and secure lifting device under side blast deflector (11). Move side blast deflector into position under vehicle.
2.
Install four washers (2) and bolts (1) on rear of side blast deflector (11) into threaded plate in fender support. Tighten
bolts to 80 lb-ft (109 Nm).
N OT E
Bolt lengths are not the same. Ensure bolts are installed as tagged.
3.
Install three washers (10), bolts (9), washers (8), and new locknuts (7) on front of side blast deflector (11). Hand tighten
locknuts.
4.
Install three washers (6), bolts (5), washers (4), and new locknuts (3) on front of side blast deflector (11). Hand tighten
locknuts.
5.
Tighten three locknuts (3) on front of side blast deflector (11) to 280 lb-ft (380 Nm).
6.
Tighten three locknuts (7) on front of side blast deflector (11).
7.
8.
Install right step (TM 9-2320-279-20).
END OF WORK PACKAGE
0027 00-3/(0027 00-4 Blank)