TB 9-2320-279-13&P-2
DOOR HANDLE ASSEMBLY REPLACEMENT - MODEL B
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Maintenance Level
References
Unit
Tools and Special Tools
Equipment Conditions
Vehicle parked on level ground (TM 9-2320-279-
Tool Kit, General Mechanic's (Item 13, WP 0034
10)
Parking/Emergency Brake applied (TM 9-2320-
Materials/Parts
279-10)
Engine off (TM 9-2320-279-10)
If equipped, Battery Disconnect Switch in OFF
position (TM 9-2320-279-10)
Locknut
N OT E
The following procedure is for left door handle assembly. Use same procedure for right door handle assem-
bly.
REMOVAL
1.
Remove spring (3) from cam (7).
2
4
3
2.
Remove locknut (8) and disconnect link rod (2) from
1
cam (7). Discard locknut.
3.
Remove spring pin (6), inside handle (4), cam (7), and
nut (5) from door (1).
8
(HIDDEN)
7
6
5
440-050
Change 1