5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Perform steps 5 thru 8 to install heater parts set.
CONNECT THERMOSTAT (14) TO
HEATER (15) AND WIRE (16).
INSTALL HEATER (15) THERMOSTAT
(14) AND WIRE (16) INTO AIR DRYER
HOUSING (7). SECURE THERMOSTAT
WITH THERMOSTAT RETAINER (17) AND
SCREW (18).
INSTALL NEW PACKING (19) TO
CONNECTOR (20).
CONNECT WIRE (16) AND HEATER (15)
TO CONNECTOR (20) AND INSTALL
CONNECTOR WITH TWO SCREWS (21).
TM 9-2320-363-34-2
NOTE
NOTE
Perform steps 9 thru 14 to install right piston seal and spring set.
INSTALL NEW LARGE PACKING (22) TO PISTON (23).
INSTALL NEW LIP SEAL (24) TO SPOOL (25).
INSTALL SPRING (26) NEW PACKING (27) AND SPOOL (25) ASSEMBLY TO PISTON (23) WITH TWO
SNAP RINGS (28).
INSTALL PISTON (23) ASSEMBLY TO AIR DRYER HOUSING (7).
INSTALL NEW LARGE PACKING (29) AND TWO NEW SMALL PACKINGS (30) TO COVER (31).
POSITION COVER (31) TO AIR DRYER HOUSING (7).
Change 1
18-15