TM 9-2320-363-34-2
6.
REMOVE NUT (22), FOUR WASHERS (23), INSULATOR (24) AND PACKING (25) FROM GROUND
STUD (26). DISCARD PACKING.
7.
REMOVE GROUND STUD (26) FROM COMMUTATOR HOUSING (10).
8.
REMOVE PACKING (27), INSULATION WASHER (28), AND WASHER (29) FROM GROUND STUD
(26). DISCARD PACKING.
9.
IF DAMAGED, REMOVE BUSHING (30) FROM COMMUTATOR HOUSING (10).
10. REMOVE PACKING (31), PIPE PLUG (32), AND FELT WICK (33) FROM COMMUTATOR HOUSING
(10). DISCARD PACKING.
11. IF DAMAGED, REMOVE BUSHING (34) FROM COMMUTATOR HOUSING (10),
NOTE
Mark nose housing and shift housing prior to removing nose housing to aid in
installation.
12. REMOVE SIX SCREWS (35), NOSE HOUSING (36), PACKING (37), AND WASHER (38) FROM
SHIFT HOUSING (39).
NOTE
Perform step 13 only if components are damaged.
13. REMOVE BUSHING (40), PLUG (41), FELT WICK (42), AND SIX PLUGS (43) FROM NOSE
HOUSING (36).
13-29